Download Project Sheet (250.59 KB) |
Project Location
Northeastern US
Project Description
Repairs were needed to an aging fluid bed incinerator. Repairs included installing a new overbed burner system, installing a new furnace skin, repairing the scrubber, as well as replacing the heat exchanger, windbox expansion joint, tuyeres, oil pumps, and electrical instruments. IFCO also coordinated the EPA testing.
Industrial Furnace Company's Role
Engineering assistance, equipment supplier, installation, commissioning
Value
$3 Million
Completed
2013